Transport Solutions
Installation & Commissioning

On-site installation, calibration, and handover.

Transport Solutions installs and commissions every Cartesy system on-site, with calibration under working load conditions and a full handover to your operators. The aim is simple: an inspection lane configured to support NCT, MOT and CVRT approval from day one, subject to local authority approval and final commissioning.

01 / ON-SITE INSTALLATION OVERSIGHT

On-site installation oversight

We coordinate delivery, civil works alignment, and equipment positioning on the day of installation — making sure the lane layout matches the pre-installation plan and the inspection authority's requirements.

02 / CALIBRATION UNDER WORKING LOAD CONDITIONS

Calibration under working load conditions

Brake testers, suspension testers, axle load systems and play detectors are calibrated against working loads, not bench conditions, so the values you read on day one are the values you will read in service.

03 / FULL SYSTEM VALIDATION TESTING

Full system validation testing

Every test module is validated end-to-end — sensors, control software, automated reporting and operator interface — to confirm the lane behaves as a unified, inspection-ready system before sign-off.

04 / OPERATOR TRAINING AND HANDOVER

Operator training and handover

Your team is trained on the equipment, the control software, and the automated reporting formats used by inspection authorities. We hand over a documented, operational lane — not a delivery receipt.

Outcome

Inspection-ready, with minimum downtime

A fully operational vehicle testing lane — prepared for NCT, MOT, or CVRT approval, with minimal downtime and maximum confidence.

Planning a new test lane?

Talk to us about lane layout, civil works specifications and approval support.

Contact us